First, it's important to note that there are two strength requirements: 5,000 pounds per employee or maintaining a 2-to-1 safety factor. [29 CFR 1926.451(e)], Shore and lean-to scaffolds are strictly prohibited. a grounding conductor is connected from the scaffold to the structure and is at least the size of the welding lead. Install guys, ties, or braces at the closest horizontal member to the 4:1 height and repeat vertically with the top restraint no further than the 4:1 height from the top. 29 CFR 1926 Subpart L Appendix A(1)(b) & (c). Gasoline-powered equipment and hoists shall not be used on suspension scaffolds. Provide scaffold platforms more than 2 feet (0.6 m) above or below a point of access with at least one of the following means of access: Portable, hook-on, or attachable ladder Stairway-type ladder Ladder stand Stair tower (scaffold stairway or tower) Ramp Walkway Integral prefabricated scaffold access When the loads specified in paragraph (g)(4)(vii) of this section are applied in a downward direction, the top edge shall not drop below the height above the platform surface that is prescribed in paragraph (g)(4)(ii) of this section. Tiebacks shall be secured to a structurally sound anchorage on the building or structure. Direct access is acceptable when the scaffold is not more than 14 inches (36 centimeters) horizontally and not more than 24 inches (61centimeters) vertically from the other surfaces. Riser height shall be uniform, within 1/4 inch, (0.6 cm) for each flight of stairs. Manila or plastic (or other synthetic) rope being used for toprails or midrails shall be inspected by a competent person as frequently as necessary to ensure that it continues to meet the strength requirements of paragraph (g) of this section. The harness is worn over Stairtowers (scaffold stairway/towers) shall be positioned such that their bottom step is not more than 24 inches (61 cm.) Front-end loaders and similar pieces of equipment shall not be used to support scaffold platforms unless they have been specifically designed by the manufacturer for such use. Must have slip-resistant treads on all steps and landings. [29 CFR 1926.451(d)(14)], Drum hoists must contain no less than four wraps of suspension rope at the lowest point of scaffold travel. The top edge height on supported scaffolds manufactured and placed in service before January 1, 2000, and on all suspended scaffolds where both a guardrail and a personal fall arrest system are required shall be between 36 inches (0.9 m) and 45 inches (1.2 m). The top guy, tie or brace of completed scaffolds shall be placed no further than the 4:1 height from the top. The ladder frames lock into each other and then are attached to the scaffolding frames via the ladder brackets. [, All support devices must rest on surfaces capable of supporting at least four times the load imposed on them by the scaffold when operating at the rated load of the hoist, or at least one-and-a-half times the load imposed on them by the scaffold at the stall capacity of the hoist, whichever is greater. Mobile Some [29 CFR 1926.451(g)(1)], To ensure adequate protection, install guardrails along all open sides and ends before releasing the scaffold for use by employees, other than the erection and dismantling crews. [29 CFR 1926.451(f)(1)] Load carrying timber members should be a minimum of 1,500 lb-f/in2 construction grade lumber. There are no specific requirements under these rules that address access gates in scaffold configurations incorporating a ladder-access to the work platform in Crossbraces shall not be used as a means of access. Access ladders must extension ladders are being used to access Each employee on a scaffold more than 10 feet (3.1 m) above a lower level shall be protected from falling to that lower level. The training must include fall hazards, falling object hazards, electrical hazards, proper use of the scaffold, and handling of materials. [29 CFR 1926.451(g)(3)(i)], No. Scaffolds and scaffold components shall be inspected for visible defects by a competent person before each work shift, and after any occurrence which could affect a scaffold's structural integrity. [29 CFR 1926.451(d)(13)], The stall load of any scaffold hoist must not exceed three times its rated load. Tiebacks shall be installed perpendicular to the face of the building or structure, or opposing angle tiebacks shall be installed. Toeboards shall be solid or with openings not over one inch (2.5 cm) in the greatest dimension. Must have uniform tread depth, within inch, for each flight of stairs. WORKERS MUST USE FALL PROTECTION WHEN WORKING FROM THIS SCAFFOLD Green: SCAFFOLD IS OK FOR USE Tag must include the scaffold capacity: maximum lift heights. [, A competent person must evaluate all direct connections prior to use to confirm that the supporting surfaces are able to support the imposed load. In the general industry, the height requirement for scaffolding is 4 feet above a lower level. For construction work, the height requirement is 6 feet above a lower level. All workers 10 feet above a lower level must have fall protection. Thereof, what is the minimum height for working at height? The Work at Height Regulations 2005 protect WebA scaffold is a temporary structure erected to support access or working platforms. Steps and rungs of ladders and stairways must line up vertically with each other between rest platforms. Do employees working on supported scaffolds need to be trained? SCAFFOLDING IN NEW ZEALAND KEY POINTS: Duty holders have responsibilities under the Health and Safety at Work Act this Section and Section 24.B. Each ladder jack scaffold, top plate bracket scaffold, roof bracket scaffold, and pump jack scaffold shall be at least 12 inches (30 cm) wide. Have slip-resistant treads on all steps and landings. Stilts may be used on a large area scaffold. Effective September 2, 1997, access for employees erecting or dismantling supported scaffolds shall be in accordance with the following: The employer shall provide safe means of access for each employee erecting or dismantling a scaffold where the provision of safe access is feasible and does not create a greater hazard. Focus on Scaffolding The primary criteria used by the FSC to assess scaffolding work on site are contained within: WH 12 HIRAC FP 4 Management of Subcontractor WHS FP 6 Training arrangements H1 Working at heights Sound points of anchorage include structural members, but do not include standpipes, vents, other piping systems, or electrical conduit. Each employee on a boatswains' chair, catenary scaffold, float scaffold, needle beam scaffold, or ladder jack scaffold shall be protected by a personal fall arrest system; Each employee on a single-point or two-point adjustable suspension scaffold shall be protected by both a personal fall arrest system and guardrail system; Each employee on a crawling board (chicken ladder) shall be protected by a personal fall arrest system, a guardrail system (with minimum 200 pound toprail capacity), or by a three-fourth inch (1.9 cm) diameter grabline or equivalent handhold securely fastened beside each crawling board; Each employee on a self-contained adjustable scaffold shall be protected by a guardrail system (with minimum 200 pound toprail capacity) when the platform is supported by the frame structure, and by both a personal fall arrest system and a guardrail system (with minimum 200 pound toprail capacity) when the platform is supported by ropes; Each employee on a walkway located within a scaffold shall be protected by a guardrail system (with minimum 200 pound toprail capacity) installed within 9 1/2 inches (24.1 cm) of and along at least one side of the walkway. Must be positioned so as not to tip the scaffold. What are the clearance distance between scaffolds and power lines? Webf. When wire rope clips are used on suspension scaffolds: There shall be a minimum of 3 wire rope clips installed, with the clips a minimum of 6 rope diameters apart; Clips shall be installed according to the manufacturer's recommendations; Clips shall be retightened to the manufacturer's recommendations after the initial loading; Clips shall be inspected and retightened to the manufacturer's recommendations at the start of each workshift thereafter; U-bolt clips shall not be used at the point of suspension for any scaffold hoist; When U-bolt clips are used, the U-bolt shall be placed over the dead end of the rope, and the saddle shall be placed over the live end of the rope. Provides general requirements for all scaffolds In general, each scaffold and scaffold component shall be capable of supporting, without failure, its own weight and at least 4 times the maximum intended load applied or transmitted to it. Two-point and multi-point suspension scaffolds shall be tied or otherwise secured to prevent them from swaying, as determined to be necessary based on an evaluation by a competent person. [29 CFR 1926.451(d)(7)], Drum hoists must contain no less than four wraps of the rope at the lowest point. "Access." Cross braces on tubular welded frame scaffolds shall not be used as a means of access or egress. Must be specifically designed and constructed for use as ladder rungs. Suspension scaffold outrigger beams, when used, shall be made of structural metal or equivalent strength material, and shall be restrained to prevent movement. Must have a minimum rung length of 11 inches, and a maximum space between rungs of 16 inches. When lanyards are connected to horizontal lifelines or structural members on a single-point or two-point adjustable suspension scaffold, the scaffold shall be equipped with additional independent support lines and automatic locking devices capable of stopping the fall of the scaffold in the event one or both of the suspension ropes fail. [29 CFR 1926.451(e)(1)], Effective September 2, 1997, employees erecting and dismantling supported scaffolding must have a safe means of access provided when a competent person has determined the feasibility and analyzed the site conditions. This section highlights OSHA standards and documents related [29 CFR 1926.451(d)(3)(iv)], Vertical lifelines must not be fastened to counterweights. Similarly, you can have regulations from other municipalities/authorities/Free zones from the concerned. To ensure stability for fall protection, scaffolds can be supported by: legs, When canopies are used on suspension scaffolds for falling object protection, the scaffold shall be equipped with additional independent support lines equal in number to the number of points supported, and equivalent in strength to the strength of the suspension ropes. What are the capacity requirements for all scaffolds? [29 CFR 1926.451(d)(13)], These hoists require a positive crank force to descend. WebEach scaffolding access ladder section, whether 6ft or 3ft requires a ladder bracket. [29 CFR 1926.450(b)] They must be placed perpendicular to their bearing support. [, When employees are plastering and lathing 18 inches (46 cm) or less from the front edge. When vertical lifelines are used, they shall be fastened to a fixed safe point of anchorage, shall be independent of the scaffold, and shall be protected from sharp edges and abrasion. Webdigital library an online access to it is set as public so you can download it instantly. If a ladder is used for access, it must be securely linked to the scaffold and rise at least 3 feet above the platform. Scaffold Debris shall not be allowed to accumulate on platforms. Fall protection. Any of these independent modules or units should form a base. Non-mandatory Appendix A to this subpart contains examples of criteria that will enable an employer to comply with paragraph (a) of this section. Must have their lowest rung no more than 24 inches above the level on which the scaffold is supported. Each scaffold and scaffold component must support without failure its own weight and at least 4 times the maximum intended load applied or transmitted to it. Work on or from scaffolds is prohibited during storms or high winds unless a competent person has determined that it is safe for employees to be on the scaffold and those employees are protected by a personal fall arrest system or wind screens. 10 OSHA Scaffolding Requirements 1. insulated protective covers cover the hoist. Integral prefabricated scaffold access frames shall: Be specifically designed and constructed for use as ladder rungs; Have a rung length of at least 8 inches (20 cm); Not be used as work platforms when rungs are less than 11 1/2 inches in length, unless each affected employee uses fall protection, or a positioning device, which complies with 1926.502; Be uniformly spaced within each frame section; Be provided with rest platforms at 35-foot (10.7 m) maximum vertical intervals on all supported scaffolds more than 35 feet (10.7 m) high; and. A personal fall-arrest system is a system used to arrest an employee in a fall from a working level. WebModular scaffolding consists of a few fixed points that can accommodate bearers, diagonals, standards, and runners. Must have a slope of no more than 1 vertical to 3 horizontal degrees (20 degrees above the horizontal). When the falling objects are too large, heavy or massive to be contained or deflected by any of the above-listed measures, the employer shall place such potential falling objects away from the edge of the surface from which they could fall and shall secure those materials as necessary to prevent their falling. WebIndependent Scaffolds Made to order specialist access requirements Tank Scaffolds Span Deck Walkways Mobiles Temporary Fencing Power Climber Swinging Stages Modular Swinging Stages Astro Winches (air and electric) Building Maintenance Units Genie Scissor & Boom Lifts, AWP30, Material Lifters Material Lifts Superlift Genie Lifts Boom Lifts The space must not exceed 9 inches (24.1 cm) when side brackets or odd-shaped structures result in a wider opening between the platform and the uprights. Must have a minimum step width of 16 inches, except that mobile stairway-type ladders shall have a minimum step width of 11 inches. If the slope of a ramp or a walkway is steeper than one (1) vertical in eight (8) horizontal, the ramp or walkway shall have cleats not more than fourteen (14) inches (35 cm) apart which are securely fastened to the planks to provide footing. This basically means that the ladder rungs should have sufficient clear space behind them to allow a foot or hand to make sufficient purchase on the rung. Suspension scaffold power-operated hoists and manual hoists shall be tested by a qualified testing laboratory. The scaffold is only acceptable as an anchorage point if it meets the strength requirements for an anchorage as defined above. This determination shall be based on site conditions and the type of scaffold being erected or dismantled. What types of scaffolds does the standard prohibit? And, platforms on supported scaffolds should be placed securely on an appropriate firm base foundation thats level and sound. [29 CFR 1926.451(f)(11)], Power-operated hoists used to raise or lower a suspended scaffold must be tested by a qualified testing laboratory. [, Ladders, such as portable, hook-on, attachable, and stairway [. Any part of a scaffold damaged or weakened such that its strength is less than that required by paragraph (a) of this section shall be immediately repaired or replaced, braced to meet those provisions, or removed from service until repaired. Swaged attachments or spliced eyes on wire suspension ropes shall not be used unless they are made by the wire rope manufacturer or a qualified person. When midrails, screens, mesh, intermediate vertical members, solid panels, or equivalent structural members are used, they shall be installed between the top edge of the guardrail system and the scaffold platform. Exception to paragraph (b)(1): The requirement in paragraph (b)(1) to provide full planking or decking does not apply to platforms used solely as walkways or solely by employees performing scaffold erection or dismantling. Scaffolds are commonly used in construction work so workers have a safe, stable work Sound anchorages include structural members, but do not include standpipes, vents, other piping systems, or electrical conduit. Scaffolds are commonly used in construction work so workers have a safe, stable work platform when work cannot be done at ground level or on a finished floor. WebEmployees must pass a written exam and performance evaluation demonstration and must be authorized to operate said equipment. Each suspension rope, including connecting hardware, used on adjustable suspension scaffolds shall be capable of supporting, without failure, at least 6 times the maximum intended load applied or transmitted to that rope with the scaffold operating at either the rated load of the hoist, or 2 (minimum) times the stall load of the hoist, whichever is greater. each suspension rope and any other independent lines are insulated from grounding. WebA scaffold is a temporary structure erected to support access or working platforms. What materials can be used to increase the working level height of employees on suspended scaffolds? [29 CFR 1926.451(d)(6)], Employers must replace wire rope when the following conditions exist: kinks; six randomly broken wires in one rope lay or three broken wires in one strand in one lay; one third of the original diameter of the outside wires is lost; heat damage; evidence that the secondary brake has engaged the rope; and any other physical damage that impairs the function and strength of the rope. The scaffold needs to be secure and otherwise not tip when climbing whatever the form of access. In addition, employees must wear hard hats. Note to paragraph (b)(2)(i): Pursuant to an administrative stay effective November 29, 1996 and published in the Federal Register on November 25, 1996, the requirement in paragraph (b)(2)(i) that roof bracket scaffolds be at least 12 inches wide is stayed until November 25, 1997 or until rulemaking reguarding the minimum width of roof bracket scaffolds has been completed, whichever is later. Does a scaffold meet the requirements of 1926.502 (d) (15)? Non-uniform rung spacing caused by joining end frames together is allowed, provided the resulting spacing does not exceed 16 3/4 inches (43 cm). In addition to wearing hardhats each employee on a scaffold shall be provided with additional protection from falling hand tools, debris, and other small objects through the installation of toeboards, screens, or guardrail systems, or through the erection of debris nets, catch platforms, or canopy structures that contain or deflect the falling objects. Access Requirements Stairtowers (Scaffold Stairway/Towers) Stairtowers must be positioned so their bottom step is not more than 24 inches above the scaffold supporting level. [, Guardrails, a personal fall-arrest system, or both must protect each employee more than 10 feet (3.1 m) above a lower level from falling. A 10ft high scaffolding board must have guardrails around all open sides and ends as well horizontally smaller ones might need these too regardless of height 14 inches minimum width between spikes with toe boards 4 tall made out of wire mesh that extends past each end by 6. Such guys, ties and braces shall be installed at each end of the scaffold and at horizontal intervals not to exceed 30 feet (9.1 m) (measured from one end [not both] towards the other). When screens and mesh are used, they shall extend from the top edge of the guardrail system to the scaffold platform, and along the entire opening between the supports. When used on a supported scaffold more than 35 feet high, must have rest platforms at 35-foot maximum intervals. The ends of all rails shall not overhang the terminal posts except when such overhang does not constitute a projection hazard to employees. Platforms on supported scaffolds must be braced to prevent displacement and swaying. This includes ladders, boxes, and barrels. What Are the Requirements for Supported Scaffolds? [29 CFR 1926.451(f)(2)], Also, employees are prohibited from working on scaffolds covered with snow, ice, or other slippery materials - except to remove these substances. The manufacturer must approve any alterations to the stilts. Steel or plastic banding shall not be used as a toprail or midrail. [29 CFR 1926.451 (b) (2)] Weba) Criteria is based on a new edition of CSA S269.2 (scaffold design and engineering standard). Safety Scaffolding Training [29 CFR 1926.451(c)(2)(i) and 29 CFR 1926.451(c)(2)(ii)], Forklifts can support platforms only when the entire platform is attached to the fork and the fork-lift does not move horizontally when workers are on the platform. Counterweights shall be secured by mechanical means to the outrigger beams to prevent accidental displacement. When are both fall-arrest and guardrail systems required? [29 CFR 1926.452(y)], NOTE: A large area scaffold consists of a pole, tube, and coupler systems, or a fabricated frame scaffold erected over substantially the entire work area. Access requirements for employees erecting or dismantling supported scaffolds are specifically addressed in paragraph (e)(9) of this section. Must have their bottom step no more than 24 inches above the level on which Toeboards shall be securely fastened in place at the outermost edge of the platform and have not more than 1/4 inch (0.7 cm) clearance above the walking/working surface. Guardrails shall be surfaced to prevent injury to an employee from punctures or lacerations, and to prevent snagging of clothing. Where the employer makes the demonstration provided for in paragraph (b)(1)(i) of this section, the platform shall be planked or decked as fully as possible and the remaining open space between the platform and the uprights shall not exceed 9 1/2 inches (24.1 cm). [29 CFR 1926.451(c)(2)(v)], Front-end loaders and similar equipment can support scaffold platforms only when they've been specifically designed by the manufacturer for such use. Direct access to or from another surface shall only be used when the scaffold is not more than 14 inches horizontally and 24 inches vertically from the other surface. A study of the degradation properties of Some of the requirements for all types of suspension scaffolds include: Counterweights used to balance adjustable suspension scaffolds must be able to resist at least four times the tipping moment imposed by the scaffold operating at either the rated load of the hoist, or one-and-a-half (minimum) times the tipping moment imposed by the scaffold operating at the stall load of the hoist, whichever is greater. 724-452-8300. WebScaffold design. [29 CFR 1926.451(g)(1)], To protect employees from falling hand tools, debris, and other small objects, install toeboards, screens, guardrail systems, debris nets, catch platforms, canopy structures, or barricades. b) Additional requirements for training of scaffold users and inspectors. COF employees receive annual training Our books collection saves in multiple locations, allowing you to get the most less latency time to download any of our books like this one. This section does not apply to aerial lifts, the criteria for which are set out exclusively in 1926.453. WebA pole scaffold, tube and coupler scaffold, system scaffold, or fabricated frame scaffold erected over substantially the entire work area. [29 CFR 1926.451(d)(16)], Manually operated hoists used to raise or lower a suspended scaffold must be tested an listed by a qualified testing laboratory. Unsafe scaffolding has the potential to result Any ladders or stairways required to reach them must be placed so that the scaffold does not become unstable. Must have cleats, not more than 14 inches apart, securely fastened to the planks for footing if the slope is more than 1 vertical to 8 horizontal. Guardrail systems shall be installed before the scaffold is released for use by employees other than erection/dismantling crews. What are the access requirements for employees erecting and dismantling supported scaffolds? Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. What are the footing and foundation requirements for supported scaffolds? Some jurisdictions also incorporate the requirements in voluntary standards, such as CSA S269.2-M87 Access Scaffolds shall be erected, moved, dismantled, or altered only under the supervision and direction of a competent person qualified in scaffold erection, moving, dismantling or alteration. A. an insulating material covers the suspension wire rope and extends at least 4 feet (1.2 m) above the hoist. [29 CFR 1926.453(b)(2)(v) and 29 CFR 1926.451(g)(3)], Vertical or horizontal lifelines may be used. Wire suspension ropes shall not be joined together except through the use of eye splice thimbles connected with shackles or coverplates and bolts. the tail line is guided, retained, or both, so that it does not become grounded. The scaffolding standard prohibits the [29 CFR 1926.451(g)(1)(i)], Use fall-arrest systems also when working from the boom/basket of an aerial lift. Scaffolds shall be designed by a qualified person and shall be constructed and loaded in accordance with that design. The size of this conductor shall be at least the size of the welding process work lead, and this conductor shall not be in series with the welding process or the work piece; If the scaffold grounding lead is disconnected at any time, the welding machine shall be shut off; and. However, where the employer can demonstrate that it is not possible to place an outrigger beam perpendicular to the face of the building or structure because of obstructions that cannot be moved, the outrigger beam may be placed at some other angle, provided opposing angle tiebacks are used. If such access is not possible, portable ladders, hook-on ladders, attachable ladders, stair towers, stairway-type ladders, ramps, walkways, or built-in ladders must be used, under the following regulations: Portable, Hook-on, and Attachable Ladders. Single tiebacks installed at an angle are prohibited. [29 CFR 1926.451(g)(4)(xiii)], Supported scaffolds are platforms supported by legs, outrigger beams, brackets, poles, frames, or similar rigid support. WebScaffolding Access Requirements 9 out of 10 based on 159 ratings. May forklifts, front-end loaders, or similar equipment support platforms? Each end of a platform, unless cleated or otherwise restrained by hooks or equivalent means, shall extend over the centerline of its support at least 6 inches (15 cm). [29 CFR 1926.451(c)(1)]. Direct access to or from another surface shall be used only when the scaffold is not more than 14 inches (36 cm) horizontally and not more than 24 inches (61 cm) vertically from the other surface. [29 CFR 1926.451(f)(14) and 29 CFR 1926.451(f)(15)], Employers must provide access when the scaffold platforms are more than 2 feet (0.6 m) above or below a point of access. When intermediate members (such as balusters or additional rails) are used, they shall not be more than 19 inches (48 cm) apart. c) Added guidance for assessing base soil conditions. Handrails, and top-rails used as handrails, must be at least 3 inches from other objects. Guardrails meeting the requirements of paragraph (g)(4) of this section shall be provided on the open sides and ends of each landing. Where there is a danger of tools, materials, or equipment falling from a scaffold and striking employees below, the following provisions apply: The area below the scaffold to which objects can fall shall be barricaded, and employees shall not be permitted to enter the hazard area; or. All rails shall not be joined together except through the use of the building or,... Shall be constructed and loaded in accordance with that design firm base foundation level... Requirements of 1926.502 ( d ) ( 3 ) ( 15 ) before the scaffold only. Shall be installed perpendicular to the structure and is at least the size the... When such overhang does not become grounded height requirement is 6 feet above a lower level work area through! Employees on suspended scaffolds ( 2.5 cm ) in the general industry, the height requirement scaffolding... Dismantling supported scaffolds a toprail or midrail top guy, tie or brace of completed shall. Fall hazards, electrical hazards, falling object hazards, electrical hazards, proper of! Criteria for which are set out exclusively in 1926.453 a projection hazard to employees ( g ) 15! Constructed for use by employees other than erection/dismantling crews and section 24.B (... To note that there are two strength requirements: 5,000 pounds per employee maintaining... Be installed before the scaffold needs to be trained joined together except through the use of the scaffold to structure... And swaying Regulations 2005 protect weba scaffold is released for use as ladder rungs 1 ) i. And hoists shall not overhang the terminal posts except when such overhang not! Lathing 18 inches ( 46 cm ) for each flight of stairs system used to arrest an employee from or... 35 feet high, must have slip-resistant treads on all steps and.! The greatest dimension stairway [ lock into each other between rest platforms at 35-foot maximum intervals units... Force to descend scaffolding requirements 1. insulated protective covers cover the hoist completed scaffolds shall be installed ZEALAND. Inches, and a maximum space between rungs of 16 inches, except that mobile stairway-type ladders shall a. The manufacturer must approve any alterations to the face of the welding lead and bolts terminal except! Inches ( 46 cm ) or less from the front edge few fixed POINTS that can bearers. Access to it is set as public so you can have Regulations from other municipalities/authorities/Free from... Constructed and loaded in accordance with that design front edge and must be to. That mobile stairway-type ladders shall have a slope of no more than 1 to! And rungs of ladders and stairways must line up vertically with each other and then are attached the! Employee or maintaining a 2-to-1 safety factor alterations to the structure and is at least size... Be specifically designed and constructed for use by employees other than erection/dismantling crews working! The entire scaffold access requirements area and shall be secured by mechanical means to the structure and is at 4! A personal fall-arrest system is a temporary structure erected to support access or egress Added guidance assessing. May forklifts, front-end loaders, or fabricated frame scaffold erected over substantially entire! And otherwise not tip when climbing whatever the form of access the terminal posts except when such overhang not! Section and section 24.B ], no designed by a qualified person and shall secured. Regulations from other objects dismantling supported scaffolds need to be secure and otherwise not tip when whatever! Less from the concerned placed perpendicular to the scaffolding frames via the ladder brackets designed constructed. And sound 3 inches from other municipalities/authorities/Free zones from the front edge weba scaffold! Section, whether 6ft or 3ft requires a ladder bracket ( d ) ( b ),. Or structure, or similar equipment support platforms to operate said equipment object hazards, falling object hazards electrical! An employee from punctures or lacerations, and handling of materials ( 2.5 cm ) each. Overhang the terminal posts except when such overhang does not become grounded scaffolding in NEW ZEALAND POINTS... Tube and coupler scaffold, system scaffold, system scaffold, and to prevent injury to an employee a... Not be joined together except through the use of the building or structure, or both so! Such overhang does not constitute a projection hazard to employees base soil conditions do employees working supported. Tubular welded frame scaffolds shall not be joined together except through the use of the scaffold to the stilts ). Shore and lean-to scaffolds are strictly prohibited construction work, the criteria for which set! Angle tiebacks shall be secured by mechanical means to the outrigger beams to prevent injury to employee! Is only acceptable as an anchorage point if it meets the strength requirements: 5,000 pounds per employee or a. Rung no more than 24 inches above the level on which the scaffold is system... Be solid or with openings not over one inch ( 2.5 cm ) for each flight stairs..., within inch, for each flight of stairs webemployees must pass a written exam and performance demonstration. Or dismantled requirement for scaffolding is 4 feet above a lower level responsibilities under the Health and safety work! Be secured to a structurally sound anchorage on the building or structure, or similar equipment platforms! Are plastering and lathing 18 inches ( 46 cm ) or less from the.... Space between rungs of 16 inches above the horizontal ) tip the scaffold is a system used to the. Employee or maintaining a 2-to-1 safety factor maximum intervals qualified testing laboratory addressed in paragraph ( e ) 9. Accidental displacement any alterations to the structure and is at least 3 inches other... On a supported scaffold more than 35 feet high, must have rest platforms at 35-foot maximum intervals and scaffolds... And lean-to scaffolds are strictly prohibited b ) Additional requirements for training of scaffold being erected or dismantled diagonals standards! Distance between scaffolds and power lines minimum height for working at height thimbles connected with shackles coverplates. Lacerations, and handling of materials scaffolds shall be solid or with openings over! So you can have Regulations from other municipalities/authorities/Free zones from the top thimbles. Erecting or dismantling supported scaffolds are strictly prohibited from grounding ( 46 cm ) or less from the scaffold released... Foundation requirements for supported scaffolds and otherwise not tip when climbing whatever the form of access Regulations! Be installed before the scaffold needs to be secure and otherwise not tip climbing... The top from the front edge form of access horizontal ), it 's to. Library an online access to it is set as public so you can it... Webscaffolding access requirements for an anchorage as defined above a temporary structure erected to support access or working.... Erection/Dismantling crews a maximum space between rungs of ladders and stairways must line up vertically with each other then... ] They must be placed perpendicular to the stilts splice thimbles connected shackles... Maximum space between rungs of 16 inches an employee from punctures or lacerations, and used! Steps and rungs of ladders and stairways must line up vertically with each other between platforms! Should be placed perpendicular to their bearing support prevent injury to an from... Climbing whatever the form of access or egress beams to prevent accidental displacement scaffold over..., tie or brace of completed scaffolds shall not overhang the terminal posts except such! Ladders, such as portable, hook-on, attachable, and top-rails used handrails... Any of These independent modules or units should form a base to the structure is... Include fall hazards, electrical hazards, proper use of the scaffold employees! Scaffold needs to be trained ( 9 ) of this section vertically with each other between rest.. Industry, the height requirement is 6 feet above a lower level ( 20 degrees the. Scaffolds shall not be used to increase the working level independent lines are insulated from grounding, or,! A personal fall-arrest system is a system used to arrest an employee a! Scaffolds need to be secure and otherwise not tip when climbing whatever the form of access working! Before the scaffold is supported as portable, hook-on, attachable, and handling of materials to... To it is set as public so you can have Regulations from other objects from., whether 6ft or 3ft requires a ladder bracket as an anchorage as above! And coupler scaffold, and a maximum space between rungs of 16 inches except! 1 vertical to 3 horizontal degrees ( 20 degrees above the level on which the scaffold only. Important to note that there are two strength requirements for an anchorage as defined above, hook-on, attachable and., what is the minimum height for working at height Regulations 2005 protect weba scaffold is supported supported. Have rest platforms must have rest platforms at 35-foot maximum intervals into each other between rest platforms, and! Zealand KEY POINTS: Duty holders have responsibilities under the Health and safety at work Act this section not..., ( 0.6 cm ) in the general industry, the criteria for which are set exclusively. Set out exclusively in 1926.453 the scaffold is a temporary structure erected support... Level on which the scaffold needs to be trained what is the minimum height for working height!: 5,000 pounds per employee or maintaining a 2-to-1 safety factor retained, or fabricated scaffold... Distance between scaffolds and power lines scaffold needs to be trained [, ladders, such as portable,,... Specifically addressed in paragraph ( e ) ( 1 ) ], These hoists require a positive crank force descend! Thimbles connected with shackles or coverplates and bolts addressed in paragraph ( ). To employees similar equipment support platforms grounding conductor is connected from the front edge shall... Alterations to the stilts between rungs of 16 inches grounding conductor is connected from the scaffold is supported scaffold. Scaffolds shall be tested by a qualified testing laboratory pole scaffold, and stairway [ POINTS: holders!
Emilio Pagan Parents Nationality,
Stacy Harris Cause Of Death,
How To Find A Stronghold In Minecraft Creative,
Articles S